| Current Project Schedules
WHIN: Annual Banquet
- Our Annual Banquet is scheduled for June 9, 2007 at the Gold Coast Hotel & Casino
NDOW (Southern Region)
- Contact Sarah McFarland at NDOW office 702/486-5127
or via email: smcfarland@ndow.org
Fraternity of the Desert Bighorn
-
Range Fires of 2006 - Damaged Projects Repair - Feb 3rd
Las Vegas Range
1. Frozen Toe - Replace 2 in. Drisco pipe of project.
2. Hidden Valley - Repair of 2 in. Drisco pipe and re-attach
to the project’s dam fittings.
Sheep Range
1. Bobcat - Replace 2 in. Drisco pipe of project.
-
Muddy Mountains – Flipper
Installation of 4 additional 1800 gallon water storage tanks
to the project.
Mar. 17th - Helicopter slinging of tanks, materials, and tools to
the project site.
Mar. 24th – Site work and the tank installation.
-
Silver Peak Range - Silver Peak #3 - April 21st and 22nd
Complete Rebuild - Helicopter Project
1. Metal apron ( 30 ft. by 60 ft.) as the water catchment means.
2. Three 1800 gallon water storage tanks.
3. Installation of a walk-in drinker.
- Clover Mountains - Beaver Dam #1 - May 19th
Complete Rebuild
1. Metal apron ( 30 ft. by 60 ft.) as the water catchment means.
2. Three 1800 gallon water storage tanks.
3. Installation of a walk-in drinker.
** Heritage Funded ** 2007 Inspection Flights of Projects
Flights on random dates and a maintenance crew may be utilized.
For more info or if you’d like to sign up to help, call Bill Vasconi @ 373-5746 or 645-4264 or, visit their website @ http://www.desertbighorn.com
WHIN: Cold Creek Elk Drinker
- Repair
to water lines and rotor rooter of the spring
head. Date to be determined.
Contact Tom B. @ 524-4889 or Tom L. @ 210-4700
WHIN: Grassy Spring
|